Warning: unlink(//system/storage/cache/cache.country.status.1500340745) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.currency.1500338101) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.language.1500338101) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.manufacturer.0.1500392249) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.return_reason.1.1500392246) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.voucher_theme.1.1500392242) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.zone.222.1500392245) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: session_start() [function.session-start]: Cannot send session cookie - headers already sent by (output started at /index.php:98) in /system/library/session.php on line 21Warning: session_start() [function.session-start]: Cannot send session cache limiter - headers already sent (output started at /index.php:98) in /system/library/session.php on line 21Warning: Cannot modify header information - headers already sent by (output started at /index.php:98) in /index.php on line 185Warning: Cannot modify header information - headers already sent by (output started at /index.php:98) in /system/library/currency.php on line 45 Experience

Experience

Projects Experience:

 

v  Design of Hydro Electric scheme for 100 MW Power Station. Preparation of tender specifications and drawings.


v  Evaluation of Bids


v  Design of Pumped Storage scheme for 4x333 MW Power Station


v  Preparation of tender specifications and drawings


v  Refurbishment of Reversible Pump, Propeller, Kaplan, Francis, Pelton and Bulb Turbine ranging from 0.5 MW to 120 MW


v  Refurbishment of Spherical Main Inlet Valve for 150 MW Hydro Power Station


v  Design & Detailing of Draft Tube Gate for 11 MW Hydro Power Station


v  Design & Detailing of components of Francis turbine for 4x200MW Power Station


v  Design & Detailing of components of Pelton turbine and spherical valve for 2x40MW Power Station


v  Design & Detailing of components for 5x30MW Lift Irrigation Scheme


v  Mechanical Balance of Plant for 9.6 MW Hydro Power Station


v  Preparation of 'As Built' drawings and operation & maintenance manuals for 2x41MW Francis turbine power station in

Indonesia.


v  Imparting of training also to operating & maintenance engineers for this project

 

New Build Experience:

 

Turbines


v  Marun, Iran – Mechanical design of Francis Turbine (1x75 MW)


v  Renun, Indonesia – Trouble shooting and design improvements to 2 x 41 MW Francis Turbines


Valves


v  Esti Hydro Project, Panama - Design of Dam bottom outlet forced cone valve


v  Foyers 100 MW Spherical type Main Inlet Valve – Design for refurbishment and residual life assessment


v  Tilbury Thermal Power Station Cooling Water Butterfly Valve – Root cause analysis and corrective actions for problems on bearings.


Gates


v  Banimboola 11 MW Hydro project, Australia – Design of the draft tube gates


v  Nam Theun 2 Laos – Design of gates