Warning: unlink(//system/storage/cache/cache.country.status.1500340745) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.currency.1500338101) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.language.1500338101) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.manufacturer.0.1500392249) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.return_reason.1.1500392246) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.voucher_theme.1.1500392242) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: unlink(//system/storage/cache/cache.zone.222.1500392245) [function.unlink]: No such file or directory in /system/library/cache/file.php on line 17Warning: session_start() [function.session-start]: Cannot send session cookie - headers already sent by (output started at /index.php:98) in /system/library/session.php on line 21Warning: session_start() [function.session-start]: Cannot send session cache limiter - headers already sent (output started at /index.php:98) in /system/library/session.php on line 21Warning: Cannot modify header information - headers already sent by (output started at /index.php:98) in /index.php on line 185Warning: Cannot modify header information - headers already sent by (output started at /index.php:98) in /system/library/currency.php on line 45 Capabilities & Services

Capabilities & Services

v  Conceptual design and preparation of feasibility reports for Pumped Storage, Conventional and Mini/Micro Hydro Electric schemes with Civil Engineers

v  Design and Preparation of tender specifications for Electro Mechanical Equipments

v  Design and Preparation of tender specifications for Switch Yard Equipments

v  Project management of contracts for timely supply of materials, controlling the cost of project and quality of equipments

v  Provide consultancy, design and detailed engineering services for refurbishment of Hydro Units.

v  Design and Detailing of Hydro turbines, Valves, Gates

v  Design and Detailing of Electrical & Mechanical Balance of Plant

v  Quality control, preparation / review of Quality Assurance Plans

v  Third party Inspection during manufacturing, testing and commissioning

v  Site Supervision

v  Witness of model tests and Site performance tests

v  Trouble shooting

v  Design, detailing, mechanical analysis of various mechanical and hydro mechanical components including rotor dynamics

v    Stress and finite element analysis of mechanical components




There are no products to list in this category.